top of page
20221229_090110 |
---|
This 37,000 square foot big box commercial space was converted into a new climbing gym. The project entailed raising the existing roof 20’ and retrofitting the existing masonry structure for its new use. A StormCapture groundwater recharge system was designed to satisfy Low Impact Development standards.
Architect: RADAR
bottom of page